Our laboratory is able to support the inspection every 5 years of water mist nozzles in accordance with EN 14972, section 9.2.7.2. The standard requires that at least two nozzles per section be removed from various parts of the system. The removed nozzles must be tested as follows according to EN 12259-1:
– function;
– k-factor;
– operating temperature;
– thermal response.
Our laboratory, experienced in printhead issues, will assist operators in selecting the tests and resolving critical problems, with particular attention to the sampling phase.